Full View
Similar items
Stainless Steel Pet Lead Traction Super Strong Gold Chain 32mm 19mm Bulldog Pitbull Large Dog Collar Leash
CZK42.40
CZK65.54 -35% OFF
2Pcs Engraved Reflective Cat Safety Buckle Collar Adjustable Custom Personalized ID Free Engraving Nylon Puppy Kittens
CZK29.05
CZK42.35 -31% OFF
and Personalized Name For Collar With Leash Set Small Medium Big Dog Collars Soft Adjustable Luxury
CZK28.05
CZK40.91 -31% OFF
Real Lead Adjustable Pet Slip Chain With Slider Strong Flat Leather Dog Training Leash For Large Dogs
CZK25.86
CZK35.64 -27% OFF
Personalized Nylon Embroidered Dog Collars Customized Puppy ID Name For Small Medium Large Dogs Adjustable Pet Collar
CZK32.86
CZK47.18 -30% OFF
Cute Lovely Camellia Fish Cat Collars Adjustable Dog Dressing Tool Pet Accessories Supplies
CZK33.68
CZK48.37 -30% OFF
Cute Luxury Adjustable Cat Necklace Personalized Heart Pendant Rhinestone Kitten Puppy Collar Pet Grooming Accessorie
CZK31.21
CZK42.96 -27% OFF
Custom Plaid Dog Collar Bowtie Matching Lead For 5size For Wedding,Birthday Gifts
CZK28.37
CZK37.02 -23% OFF
Ribbon Bowtie Adjustable Cat Necklace Pet Birthday Party Accessories For Kittens Puppies Small Dogs Breakaway Collar
CZK29.12
CZK43.09 -32% OFF
4PCS Cute Knitted Pet Collars – Adjustable, Soft & Comfortable, Suitable Daily Wear For Kittens And Small Dogs
CZK27.70
CZK38.16 -27% OFF
1.5 1.8 3 6 10 15 20 30 50M Solid Leash For Large Dogs Pet Puppy Walking Training Lead Big Dog Nylon Rope Long Leashes
CZK692.31CZK1,107.16
Color : C794-Black 1.5M









Quantity :
Report
Include copyright infringementFree Standard Shipping. See details
Estimated between Thu, Aug 6 and Mon, Aug 10
You can return the product within 30 days of receipt. See details
Shop with confidence
Money Back Guarantee
Get the item you ordered or your money back. Learn more
About this item
Sourced from Pet Supplies Mall
Seller assumes all responsibility for this listing.Item number: 40384255
Item specifics
Item description from the seller
Long Strong Nylon Dog Leash 10m 15m 20m Pet Training Leash For Small Big Dogs Outdoor Walking Puppy Lead Rope Labrodor Supplies
Product:Nylon Dog Leash
Color:Black
Length:1.5m/1.8m/3m/6m/10m/15m/20m/30m/50m*2cm
Feature:Durable,Nylon Material, Long ,Strong,Durable,Convenient to operate
Support:Dropshipping and Wholesale
Suit:Outdoor,Hiking,Walking
Suit for:Small,Medium,Large Dogs,Cats,Puppy ( Yorkie,Chihuahua,French Bulldog,Dachshund,Beagle,Schnauzer,Poodles,Pitbull,Golden retriever,Labrador retriever,German Shepherd)
NOTE
1.Due to manual measurement, please allow a measurement deviation of 0.5-1 cm.
2.Due to the difference in display and lighting effects, the actual color of the item may be slightly different from the color shown on the picture.








Videos
Videos for this product








